Home » Products » Machinery & Parts » Electronics Manufacturing Equipment » Electronics Production Machinery
PCB electro-plated method, automatic barrel copper, nickel, chromium plating machine
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Beijing
- Validity to:
Long-term effective
- Last update:
2017-11-05 18:54
- Browse the number:
106
Company Profile
- GBSA(Gyeonggido Business & Science Accelerator) / WTC suwon
-
Contact:
etch(Ms.)
-
Email:

-
Telephone:

-
Area:
Beijing
-
Address:
(906-5, liu-dong), 107 Gwanggyoro, Yeongtong-gu, Suwon, Gyeonggi-do, Gyeonggi-do, South Korea
- Website: http://etch.lvxiangruaa.com/
By certification [File Integrity]
Product details
Model Number: GE139-#4957
Brand Name: Golden Eagle
Key Specifications/Special Features:
1. Hanging plated2. Barrel platedSpecifications:Maximum dimension of the sample:(L) 700 * (W) 500 * (H) 500mmProcess requirement electroplating nickel-copper-nickel-chromium
Operation method automatic
Lifting weight: >300kg
Heating method: electrical heating
Heating up to defined temperature: <1-1.5hours
Hanging fixture quantity customized
Water consumption: approximately 2000kg/hours
Electricity consumption: 180kW (without rectifier electricity consumption)
Exhaust air: 26,000cbm/hours
Production line dimensions: 30*6*4.5m (or customized)
Electroplating production line process:
Plating tanks process time (min) temperature (℃)
1 Loading station
2 Electrolytic degreasing: 5-1050-60
3 Hot water cleaning: 0.540-80
4 Cold water: 0.5 room temperature
5 Hydrochloric acid: 1-3 room temperature
6 Cold water: (double) 1 room temperature
7 Dark nickel plating: 10-15 room
Operation method automatic
Lifting weight: >300kg
Heating method: electrical heating
Heating up to defined temperature: <1-1.5hours
Hanging fixture quantity customized
Water consumption: approximately 2000kg/hours
Electricity consumption: 180kW (without rectifier electricity consumption)
Exhaust air: 26,000cbm/hours
Production line dimensions: 30*6*4.5m (or customized)
Electroplating production line process:
Plating tanks process time (min) temperature (℃)
1 Loading station
2 Electrolytic degreasing: 5-1050-60
3 Hot water cleaning: 0.540-80
4 Cold water: 0.5 room temperature
5 Hydrochloric acid: 1-3 room temperature
6 Cold water: (double) 1 room temperature
7 Dark nickel plating: 10-15 room
| Maximum dimensions of the sample | (L) 700 * (W) 500 * (H) 500mm |
| Process requirements | electroplating nickel-copper-nickel-chromium |
| Operation method | automatic |
| Lifting weight | >300kg |
| Heating method | electrical heating |
| Heating up to defined temperature | <1-1.5 hours |
| Hanging fixture quantity | customized |
| Water consumption | approximately 2000kg/hours |
| Electricity consumption | 180kW (without rectifier electricity consumption ) |
| Exhaust air | 26,000cbm/hours |
| Production line dimensions | 30*6*4.5m (or customized) |
Shipping Information:
- FOB Port: Tianjin
- Lead Time: 45 - 65 days
- HTS Code: 8486.20.90 00
- Dimensions per Unit: 0.7 × 0.5 × 0.5 Meters
- Weight per Unit: 300 Kilograms
- Units per Export Carton: 1
- Export Carton Dimensions L/W/H: 30 × 6 × 4.5 Meters
- Export Carton Weight: 2000 Kilograms
Main Export Markets:
- Asia
- Australasia
- Central/South America
- Eastern Europe
- Mid East/Africa
- North America
- Western Europe
New Products
-
High Temperature Heat Pump
price: Negotiable
-
R32 Inverter Heat Pump
price: Negotiable
-
Domestic Heat Pump Water Heater
price: Negotiable
-
Commercial Air Source Heat Pump
price: Negotiable
-
Dc Heat Pump
price: Negotiable
-
Used CAT 336D Crawler Excavator
price: Negotiable











